INTERNATIONAL JOURNAL OF NOVEL RESEARCH AND DEVELOPMENT International Peer Reviewed & Refereed Journals, Open Access Journal ISSN Approved Journal No: 2456-4184 | Impact factor: 8.76 | ESTD Year: 2016
Scholarly open access journals, Peer-reviewed, and Refereed Journals, Impact factor 8.76 (Calculate by google scholar and Semantic Scholar | AI-Powered Research Tool) , Multidisciplinary, Monthly, Indexing in all major database & Metadata, Citation Generator, Digital Object Identifier(DOI)
The study entitled “Risk management and performance of donor funded projects: A case of Rwanda urban development projects (RUDP) in Rusizi district (2016/17-2020/21)” was conducted for assessing whether risk management has significant correlation on performance of donor funded project or not. The study has adopted descriptive and inferential statistics. The above study objectives were achieved using information collected from the field and that got from secondary sources of data. Information collected from the field were got from 65 RUDP stakeholders. Data were collected using a list of questions and data cleaning was made successfully. Data analyses were presented in form of statistics both descriptive and inferential statistics. All information arrangement and analysis were achieved using Pearson SPSS version 20. Reference to the study findings where risk management recorded its statistical significance, positive and weak correlation on donor funded projects success or performance, the study concludes by failing to accept the null hypothesis (H0) and accepting the alternative hypothesis (H1). Reference to the results presented in this thesis, the model is fitting and risk mitigation, risk identification, risk assessment, risk control, and implementation of risk management each contribute 42.7% to the performance of donor funded project. The study findings revealed that in some areas, some risk assessment practices were not ensured at excellent level (was ensured at medium level). Also, all the RUDP goals were not achieved at an excellent level. Thus, RUDP managers are required to revise risk management practices within the remaining project implementation scope and ensure that the project’s stated goals are being achieved as planned.
"ASSESSMENT OF RISK MANAGEMENT AND PERFORMANCE OF DONOR FUNDED PROJECTS: A CASE OF RWANDA URBAN DEVELOPMENT PROJECTS (RUDP) IN RUSIZI DISTRICT", International Journal of Novel Research and Development (www.ijnrd.org), ISSN:2456-4184, Vol.8, Issue 4, page no.d514-d521, April-2023, Available :http://www.ijnrd.org/papers/IJNRD2304373.pdf
Downloads:
000118762
ISSN:
2456-4184 | IMPACT FACTOR: 8.76 Calculated By Google Scholar| ESTD YEAR: 2016
An International Scholarly Open Access Journal, Peer-Reviewed, Refereed Journal Impact Factor 8.76 Calculate by Google Scholar and Semantic Scholar | AI-Powered Research Tool, Multidisciplinary, Monthly, Multilanguage Journal Indexing in All Major Database & Metadata, Citation Generator
Facebook Twitter Instagram LinkedIn