Paper Title

Analysis of project Delivery Systems

Article Identifiers

Registration ID: IJNRD_220628

Published ID: IJNRD2405162

DOI: Click Here to Get

Authors

Mansi Mangesh Devlekar

Keywords

Abstract

The phrase "project delivery" refers to the full procedure of beginning, working on, and concluding a project, including, among other things, the structure or facility's construction or renovation. It requires extensive planning, design, and building work from many different parties. A project delivery system defines the structure of the relationships of the parties, the roles and responsibilities of the parties, and the general sequence of activities required to deliver the project. Project Delivery Systems are one of the crucial elements of successful completion of any project. A specified set of procedures, numerous roles, and standards are necessary for the project delivery system to function. It ensures reduction in cost, enhanced quality, on-time project completion and is also essential for optimum use of available resources. The ideal project delivery method is still up for debate in the design and construction sector. Picking up a trade journal may often yield an article on the decision of project delivery techniques for a design and construction project. Based on specific project needs, owner characteristics and conditions, and the effective formation of the project team, the project delivery system should be chosen. It is essential for the owner to select the right delivery system, which will be influenced by the financial and managerial expertise they possess and accordingly will be helpful in choosing the appropriate party to do the job. The opportunity for design experts and the construction industry is to help owners become aware of the many project delivery options before assisting owners in selecting the best option for their project and circumstances. The owner should always gain from the decision, and it should also encourage winning outcomes for all project participants. This research aims at studying different PDSs used in the construction industry and understanding their relevance through comparison. Further through PESTEL analysis, risk factors in projects were identified. Prepare a literature review after referring to research papers and listing down all the factors considered by respective researchers. Conduct a survey to find out which factors affect the selection of PDS in real-time. Lastly, using all the data gathered, testing the reliability and validity using statistical tools. To conduct this study, various reports and literature from renowned publications were referred. These documents are mainly focused on models like, DB, DBB, CMR, IPD and PPP models which included BOO, BOT, BOOT, DBFMO, etc. Since, each project has attributes unique to it, it can be concluded that most appropriate delivery model is a must, which will satisfy most of the project needs, standards, economic and ecological conditions.

How To Cite

"Analysis of project Delivery Systems", IJNRD - INTERNATIONAL JOURNAL OF NOVEL RESEARCH AND DEVELOPMENT (www.IJNRD.org), ISSN:2456-4184, Vol.9, Issue 5, page no.b467-b480, May-2024, Available :https://ijnrd.org/papers/IJNRD2405162.pdf

Issue

Volume 9 Issue 5, May-2024

Pages : b467-b480

Other Publication Details

Paper Reg. ID: IJNRD_220628

Published Paper Id: IJNRD2405162

Downloads: 000121172

Research Area: Civil Engineering 

Country: Raigad, Maharashtra, India

Published Paper PDF: https://ijnrd.org/papers/IJNRD2405162.pdf

Published Paper URL: https://ijnrd.org/viewpaperforall?paper=IJNRD2405162

About Publisher

Journal Name: INTERNATIONAL JOURNAL OF NOVEL RESEARCH AND DEVELOPMENT(IJNRD)

ISSN: 2456-4184 | IMPACT FACTOR: 8.76 Calculated By Google Scholar | ESTD YEAR: 2016

An International Scholarly Open Access Journal, Peer-Reviewed, Refereed Journal Impact Factor 8.76 Calculate by Google Scholar and Semantic Scholar | AI-Powered Research Tool, Multidisciplinary, Monthly, Multilanguage Journal Indexing in All Major Database & Metadata, Citation Generator

Publisher: IJNRD (IJ Publication) Janvi Wave

Publication Timeline

Peer Review
Through Scholar9.com Platform

Article Preview: View Full Paper

Call For Paper

Call For Paper - Volume 10 | Issue 8 | August 2025

IJNRD is Scholarly open access journals, Peer-reviewed, and Refereed Journals, High Impact factor 8.76 (Calculate by google scholar and Semantic Scholar | AI-Powered Research Tool), Multidisciplinary, Monthly, Indexing in all major database & Metadata, Citation Generator, Digital Object Identifier(DOI) with Open-Access Publications.

INTERNATIONAL JOURNAL OF NOVEL RESEARCH AND DEVELOPMENT (IJNRD) aims to explore advances in research pertaining to applied, theoretical and experimental Technological studies. The goal is to promote scientific information interchange between researchers, developers, engineers, students, and practitioners working in and around the world. IJNRD will provide an opportunity for practitioners and educators of engineering field to exchange research evidence, models of best practice and innovative ideas.

Indexing In Google Scholar, SSRN, ResearcherID-Publons, Semantic Scholar | AI-Powered Research Tool, Microsoft Academic, Academia.edu, arXiv.org, Research Gate, CiteSeerX, ResearcherID Thomson Reuters, Mendeley : reference manager, DocStoc, ISSUU, Scribd, and many more

How to submit the paper?

Important Dates for Current issue

Paper Submission Open For: August 2025

Current Issue: Volume 10 | Issue 8

Last Date for Paper Submission: Till 31-Aug-2025

Notification of Review Result: Within 1-2 Days after Submitting paper.

Publication of Paper: Within 01-02 Days after Submititng documents.

Frequency: Monthly (12 issue Annually).

Journal Type: International Peer-reviewed, Refereed, and Open Access Journal.

Subject Category: Research Area